Overview

Jon Berkoe is a leading expert in the application of emerging technology in the construction industry. He provides a solutions-oriented approach that has consistently resulted in real and tangible improvements in the use of construction technology in both engineering and construction roles, working for owners, builders, software companies, and other major stakeholders in the construction life cycle.

Mr. Berkoe started his career at General Electric and Lockheed, and then worked for Bechtel Corporation for over twenty-five years, managing several strategic technology initiatives. He was recognized by in 2010 as one of the initial five Distinguished Engineers selected globally for his role in pioneering the use of advanced simulation and high-end computing. He was directly involved in projects including major liquefied natural gas (LNG) plants and petroleum refineries, aluminum processing plants, copper concentrator plants, the US Department of Energy Waste Treatment Plant, two US Department of Defense chemical weapons sites, fossil and renewable power plants, international airports, and the Tacoma Narrows Bridge expansion. He has presented and published his work in a wide range of industry forums on many of these projects.

In 2011, Mr. Berkoe assumed a leadership role in a new Bechtel corporate initiative focused toward the development and execution of strategic pilot projects and roadmaps for enabling cross-functional implementation of virtual design and construction tools and practices for the advancement of building information modeling (BIM) across the enterprise. This work contributed to the formation of Bechtel’s practice group in construction innovation known at the Virtual Project Delivery team.

In 2014, Mr. Berkoe became a global director for a UK-based software company, focused on advancing the practice of modern digital construction and project planning, and working with leading builders around the world in the development of 4D scheduling and related project planning. He was directly involved in projects including the Battersea Power Station Redevelopment (London), Hinkley Point Nuclear Power Station (UK), Los Angeles Airport Expansion, Corpus Christi LNG Tanks, and Crossrail Underground Rail Expansion (London).

Mr. Berkoe focuses on enabling commercial and government owners, contractors, architect/engineering firms, and major trade contractors on complex projects by analyzing and determining proper means and methods to obtain maximum value from currently available construction technology, such as 4D and 5D planning, and minimizing the risk of deploying and implementing new technology. He assists clients by implementing initial protocols and continuous improvement for the proper development of BIM and its integration with the project schedule (4D) for project design and construction, starting from the schematic level to more detail as design and planning are further developed, resulting in improved cost, time, and reliability of project delivery.

Education

Massachusetts Institute of Technology
MS, Mechanical Engineering, 1984
BS, Mechanical Engineering, 1984

Employment History

Synchro Software, Ltd
Director
2014 - 2018

Bechtel Corporation
Senior principal engineer
2011 - 2014

Bechtel Systems and Infrastructure, Inc
Senior principal and chief engineer
2005 - 2011

Bechtel National, Inc
Principal engineer, 1997 - 2005
Engineering specialist, 1988 - 1997

Lockheed Missiles and Space, Inc
Senior Mechanical Engineer
1987 - 1988

General Electric Nuclear Business Operations
Mechanical engineer
1984 - 1987

Honors

Honors

National Academy of Engineers Gilbreth Lecturer Award, 2005

Society of Mining Engineers Krumb Lecturer Award, 2002

Bechtel Distinguished Engineer, 2001

Frontiers of Engineering Symposium Invited Participant, 1998

Affiliations

Professional Affiliations

Stanford University Center for Integrated Facilities Engineering (CIFE)
Advisory Board Member, 2012 - 2018